Back to Browse/Meridian Energy Partners

Meridian Energy Partners

VERIFIED
Texas, West US4.7(34 reviews)Member since September 2024
RATE$0.0650/kWh
SLA99.7%
COOLINGImmersion
4.2 MW Available

ABOUT THIS FACILITY

Meridian Energy Partners operates a Tier-3 equivalent hosting facility in West Texas, purpose-built for high-density cryptocurrency mining operations. Our 40,000 sq ft facility leverages immersion cooling technology to maximize hash rate efficiency while minimizing thermal throttling. Strategically positioned near ERCOT grid interconnection points, we offer competitive power rates with 99.7% uptime backed by redundant power feeds and on-site generator backup. Our team of experienced data center engineers provides 24/7 NOC monitoring, proactive maintenance, and dedicated account management for every client.

CAPACITY

TOTAL CAPACITY12 MW
7.8 MW Used4.2 MW Available
Used
Available
EXPANSION+5 MW by March 2026
MINIMUM MACHINES50

TECHNICAL SPECIFICATIONS

POWER SOURCEHydro + Grid
COOLING TYPEImmersion
RACK DENSITY40 kW/rack
NETWORKDual 10 Gbps fiber, BGP multi-homed
REDUNDANCYN+1 power, dual utility feeds, 2MW diesel backup
POWER RATE$0.0650/kWh

SUPPORTED MACHINES

S21S21+S19 XPS19j ProM60T21

SECURITY & COMPLIANCE

BUSINESS TERMS

PRICING MODELPer kW/month
PRICE RANGE$65 - $85 / kW / month
CONTRACT LENGTH6 - 24 months preferred
SETUP FEE$500 per unit (waived for 100+ machines)

REVIEWS

4.7
34 reviews
5
3
4
2
3
0
2
0
1
0
HashCore Mining

January 15, 2026

Outstanding facility. Immersion cooling keeps our S21s running at peak efficiency with zero thermal throttling. Support team is incredibly responsive — had a power event at 3 AM and they were on it within minutes. Best hosting partner we've worked with.

BlockStream Capital

December 28, 2025

Moved 200 machines here from a competitor and the difference is night and day. Professional onboarding, transparent billing, and the uptime has been exactly as advertised. The immersion setup is top-tier.

Satoshi Mining Co.

November 20, 2025

Solid facility with good power rates for the region. Onboarding took a bit longer than expected (about 2 weeks), but once we were up and running everything has been smooth. Good monitoring dashboard.

DigitalPick Ventures

October 5, 2025

We've been here since they opened and have scaled from 50 to 300 machines. Pricing is fair, team is knowledgeable, and the facility is genuinely impressive in person. Highly recommend scheduling a site visit.

CryptoNorth LLC

September 12, 2025

Good value for immersion hosting. The minimum machine requirement of 50 might be high for smaller operators, but if you have the volume this is a great option. Power has been stable and reporting is detailed.

$0.0650/kWh4.2 MW available
REQUEST HOSTING

REQUEST HOSTING

QUICK REQUEST

Minimum: 50 machines

Meridian Energy Holdings LLC

Hosting Provider

Response Time
< 2 hours
Member sinceSeptember 2024