For Bitcoin Mining Operators

Your Bitcoin mining site could be worth 10x more as AI infrastructure.

Sites trading for $300K–$500K per MW as mining facilities are selling for $3M–$8M per MW to AI buyers. We help you find out what yours is worth — and find the buyer.

Confidential. No NDA required. Operators since 2020.

$300K–$500K/MW
Typical mining site valuation
$3M–$8M/MW
AI-ready site valuation
$70B+
AI/HPC contracts signed by miners in 2025

The mining-to-AI pivot is no longer a thesis. It's the trade.

In 2025 alone, public Bitcoin miners signed over $70 billion in AI and HPC contracts. The economics speak for themselves.

Core Scientific
$10.2B
12-year CoreWeave deal, 270+ MW HPC capacity
TeraWulf
$12.8B
522 MW contracted, exiting BTC mining entirely
Hut 8
$7B
15-year River Bend AI lease, Google-backed
IREN
$9.7B
5-year Microsoft partnership, 3 GW power portfolio

Why your site is worth more than you think.

Bitcoin mining infrastructure costs $700K to $1M per megawatt to build. AI-ready infrastructure costs $8M to $15M per megawatt.

That gap exists because AI workloads demand things mining never required: redundant power, dense liquid cooling, fiber connectivity, and credit-grade operators. But your mining site already solved the hardest part — energized power with grid interconnection. That's what AI buyers can't get anywhere else without waiting 3-5 years in queue.

The result: sites that traded for $300K–$500K per MW as mining facilities are being acquired for $3M–$8M per MW by AI buyers, hyperscalers, and neoclouds who need power yesterday.

Mining valuation
$300K–$500K/MW
AI valuation
$3M–$8M/MW

10–15x value differential, depending on site readiness

Not every mining site converts. Here's what AI buyers actually want.

Five factors determine whether your site gets a premium AI valuation, a partial conversion offer, or a mining-only price.

01
Energized power with interconnection

Active grid interconnection or signed PPA. Permitted capacity matters more than nameplate. ERCOT, MISO, PJM, and SPP carry premium multiples.

02
Substation and transformer status

Existing high-voltage infrastructure shaves 24-36 months off AI buyer timelines. Transformer lead times are the bottleneck for greenfield builds.

03
Building, cooling, and density readiness

Existing structures can be retrofitted at $3-4M per MW. Sites with liquid cooling capability or 50kW+ rack density command premium offers.

04
Fiber and network connectivity

AI workloads need 100G+ network paths and proximity to fiber backbones. Sites within 25 miles of major fiber routes are dramatically more valuable.

05
Community and regulatory standing

Permitting, water rights, noise compliance, and local relationships. Buyers pay premiums for sites that won't generate community pushback.

Three paths. We help you pick the right one.

Not every operator should sell. Some sites are better as hybrid. Some are worth converting yourselves. We'll tell you the truth.

Sell the site

Best for: Operators ready to exit or redeploy capital

We list your site confidentially to our network of neoclouds, hyperscalers, and AI infrastructure funds. You get competing offers and we help negotiate the best terms.

  • Confidential listing to qualified buyers
  • Competitive bidding process
  • Full transaction support

Convert and lease

Best for: Operators who want recurring revenue

Keep ownership, convert to AI-ready infrastructure, and lease to credit-grade tenants. We help structure the conversion and find anchor tenants.

  • Retain site ownership
  • Long-term lease revenue
  • Conversion financing options

Hybrid operations

Best for: Operators hedging both markets

Run mining and AI workloads side by side. Allocate power dynamically based on market conditions. Some sites are better as hybrid plays.

  • Diversified revenue streams
  • Flexible power allocation
  • Market-responsive operations

Why operators work with Nexus

We're not consultants. We're operators who've been in the mining business since 2020.

Operators, not consultants

We've run mining operations since 2020. We understand the economics, the infrastructure, and the pain points.

Buyer network

Direct relationships with hyperscalers, neoclouds, and AI infrastructure funds actively seeking powered sites.

Confidential process

Your site details stay private until you authorize disclosure. No tire-kickers, no public listings.

Transaction support

From valuation to LOI to close. We've structured deals from 5 MW to 500 MW.

Get a free site valuation

Tell us about your site. We'll provide a confidential valuation and recommendations — no strings attached.

We'll only use your details to follow up on this request. No spam.

Your information is kept strictly confidential. We never share site details without explicit permission.

Frequently asked questions

How do you calculate site valuations?
We evaluate based on power capacity, interconnection status, infrastructure condition, location, and current market comps. AI-ready sites are valued based on $/MW multiples from recent transactions, adjusted for site-specific factors.
Is my information kept confidential?
Yes. We never share your site details, location, or identity with potential buyers without your explicit permission. You control what gets disclosed and when.
What's the typical timeline for a sale?
For sites with clean title and energized power, 60-120 days from listing to close is common. More complex transactions (partial sales, lease-back structures) can take 4-6 months.
Do I need to stop mining operations to sell?
No. Many buyers actually prefer sites with active operations — it proves the infrastructure works. Sale terms can include transition periods or even ongoing mining rights.
What if my site isn't AI-ready?
Not every mining site qualifies for premium AI valuations. We'll give you an honest assessment and, if appropriate, recommendations for improvements that could increase value.
How does Nexus get paid?
We work on a success fee basis for transactions. Valuations and initial consultations are free. Our interests are aligned with yours — we only succeed when you do.

Find out what your site is worth

The market for mining-to-AI conversions is moving fast. Get a confidential valuation and see if your site qualifies for a premium offer.